Quantcast

Central South Dakota News

Tuesday, December 3, 2024

SDDOT Outlines 2023 Traffic Impacts for Pierre/fort Pierre Bridge Project

Announcement

Announcement | Pexels by Markus Winkler

Announcement | Pexels by Markus Winkler

In advance of the upcoming construction season, the South Dakota Department of Transportation (SDDOT) wants to outline anticipated traffic impacts on the Pierre/Fort Pierre Bridge project with local and regional commuters. The installation of two-way traffic in the eastbound lanes from the U.S. Highway 14/83 junction in Fort Pierre to Charles Street in Pierre is planned for the Spring of 2023.Closure of the westbound lanes is necessary for construction of the new bridge superstructure, berms, concrete paving, and intersection work.

In addition to the two-way traffic configuration, a 10-foot width restriction will also be in effect. The width restriction will remain in place through the entire 2023 construction season. Over-width vehicles will be directed around the Oahe Dam utilizing S.D. Highway 1806, S.D. Highway 204, and S.D. Highway 1804. 

Pedestrian access will remain open, with flagging utilized as needed to accommodate pedestrian crossings through construction areas. 

For the safety of the public and construction workers, commuters should reduce their speed and be on constant alert throughout the project limits.

For the latest construction information, videos, and photos, please visit the project website at https://pierre-ftpierrebridge.com.

Original source can be found here.

ORGANIZATIONS IN THIS STORY

!RECEIVE ALERTS

The next time we write about any of these orgs, we’ll email you a link to the story. You may edit your settings or unsubscribe at any time.
Sign-up

DONATE

Help support the Metric Media Foundation's mission to restore community based news.
Donate

MORE NEWS